Another great week of construction!

  • Our new aerial photos are here. Note the roof progress and the brick wrapping around the new building.
  • 7.23.14 aerial
  • 7.23.14 aerial 2
  • A 250 ton crane will be setting the air handling unit on the reinforced auditorium roof on Friday, Aug. 1.  It should be quite a sight!
  • The building is now “dried in” so that all interior work will be kept dry.
  • The third floor has drywall, lights, paint.  Flooring starts next week.
  • The second floor is close behind with paint and ceiling grid being installed.
  • The first floor is getting drywall and mechanical work done.
  • The brick progress is beautiful.  You can see the limestone caps being installed on the gym and cafeteria areas.

Have a great weekend!

Kathy Ryan    513-309-8743    ryank@wyomingcityschools.org